RAM
DDR3, DDR4, DDR5, server RDIMM
Learn moreOffice and data centre UPS systems collected with their batteries, which are handled separately from other e-waste.
PrivAce Technologies collects and buys used UPS systems, from office line-interactive units to rack and modular data centre UPS, from APC, Eaton, Vertiv, Numeric, Microtek and others. Batteries are kept separate from other e-waste because they fall under India’s Battery Waste Management Rules, 2022, and are documented on their own line.
No minimum quantity. Payment before pickup for working units. Batteries collected in the same visit.
| Type | Examples | Notes |
|---|---|---|
| Office and desktop UPS | APC Back-UPS and Smart-UPS, Eaton 5E and 5SC, Microtek, Numeric | Collected with or without batteries |
| Rack UPS and PDUs | APC Smart-UPS rack models, Eaton 5PX and 9PX, metered and switched PDUs | Often retired during server room changes |
| Online and modular UPS | APC Symmetra and Galaxy, Eaton 93 series, Vertiv Liebert | Removal planned with your facility team |
| Batteries | Sealed lead-acid (SMF and VRLA) blocks, battery cabinets, lithium-ion packs | Handled separately under the Battery Waste Management Rules, 2022 |
India regulates waste batteries under the Battery Waste Management Rules, 2022, separately from the E-Waste (Management) Rules, 2022. So UPS batteries are kept apart from other e-waste in the pickup and listed on their own.
Large battery strings in server rooms are shut down and disconnected with your facility or electrical team before removal. Nothing is disconnected live.
The UPS unit itself, without its batteries, is handled as electronic equipment. Working units can be resold once tested.
Tell us the battery type and count. Lead-acid and lithium-ion batteries are packed and transported differently.
Equipment is inspected before the quotation. These are the things that matter most.
| What we check | Ideal | Needs attention |
|---|---|---|
| Unit | Tested and working | Faulty or burnt |
| Batteries | Type and count listed | Swollen or leaking |
| Access | Clear route to a loading point | Floor or lift restrictions unknown |
| Shutdown | Planned with your facility team | Not yet planned |
| Paperwork | Asset list with serials | None |
DDR3, DDR4, DDR5, server RDIMM
Learn moreSATA, M.2 NVMe, U.2 enterprise
Learn moreSeagate, WD, Toshiba, SAS and SATA
Learn moreiPhone, iPad, Samsung Galaxy, rugged devices
Learn moreYes. They are collected in the same visit as the UPS units, kept separate from other e-waste and listed on their own.
Not under Indian law. Waste batteries are covered by the Battery Waste Management Rules, 2022, while the UPS unit itself is electronic equipment.
Yes. Removal is scheduled with your facility team so the string is shut down and disconnected safely first.
Yes. Faulty units are collected and listed separately on the quotation.
Yes. There is no minimum quantity, for companies or individuals.
Last reviewed 30 September 2026. Sources: Battery Waste Management Rules, 2022 (official text).
Send photos, models and quantity. The inspection is free, and payment reaches your account before we collect.
Call us directly: we’ll scope your IT asset disposal in minutes.
+91 973 973 2048Monday-Saturday · 9 AM to 8 PM
Popular searches: data destruction, hard drive destruction, laptop buyback, certificate of destruction.